How to do backflow testing

A homeowner cannot run a backflow test with a hardware store kit, and plumbing permits are issued by the building office covering your address. This page explains who does what and where to start.

Backflow assembly on a horizontal supply line with two check valves, test cocks and a relief port.

A backflow test shows that the one-way assembly fitted to your water line still blocks used or irrigation water from flowing back into the supply. A tester your water district accepts runs the test with a gauge kit and files the report with the district. This page walks through the process and, because the questions overlap, how to request a plumbing permit. Rules and fees sit with the water supplier and building office, and permits, codes and inspections puts them in context.

Which testers may check a backflow assembly?

Water suppliers in California generally accept reports only from testers who hold the credential the district recognizes, so a homeowner cannot test their own assembly and file it. The tester uses calibrated gauges, records pressures on each check valve, and sends the result. Ask your district which testers it takes, and keep your copy of the report.

The assembly itself is the device on the line: a reduced pressure assembly, double check valve or pressure vacuum breaker. You usually see them on irrigation systems, fire sprinkler feeds, and sometimes at the meter on a larger or unusual property. Check the label, since the model name tells the plumber what test is needed. Device types are described in backflow prevention testing, and the practical side of hiring a tester is in backflow testing services.

Gas piping is permitted work and not for DIY, however simple it looks. If you smell gas, get out, use the SoCalGas line, 1-800-427-2200, from outdoors, and call 911 when you feel in danger. What the law expects on gas lines is covered in residential gas piping codes and gas line plumber.

Water heater replacement, new gas appliances and repipes also need permits. If a water heater is part of the job, see water heaters for what a replacement visit involves. Back to the plumber home page for any other service.

What is the way to obtain a plumbing permit?

Call the building office that covers the work address, learn what the job requires, and apply at the counter or through the online system where one exists. A contractor usually pulls the permit and books inspections. Any job needing a permit calls for a California contractor license, so let the plumber handle it.

Which office? For Murrieta addresses it is the City of Murrieta Building and Safety Division, listed at 951-461-6062, with phones answered between 8 a.m. and 5 p.m. For Wildomar, use the City of Wildomar Building and Safety counter, listed at 951-677-7751. French Valley, Winchester and Lakeland Village are mostly unincorporated Riverside County, and the county lists (951) 955-1800. For unincorporated Fallbrook, Rainbow and De Luz, San Diego County's building services line is listed at (858) 565-5920. Those county details come from county listings, so confirm before you travel.

Canyon Lake is a city, and the city hall number is (951) 244-2955. Murrieta Hot Springs and Old Town sit inside the city of Murrieta, so use its office.

What happens during a test?

First the tester closes off water to the assembly and connects the gauge. The test cocks are opened in sequence, the pressure differences are read, and the tester notes whether each check valve holds. After a failure, repair parts such as seats, springs or rubber discs are swapped and the assembly is retested. Water is off briefly, which in a house with irrigation means the sprinklers pause.

Backflow assembly close-up with test gauge hoses running to its test cocks.

A failed assembly is common, and repair is often a part swap, not a replacement. A leaky relief port can also be harmless dripping or the sign of a bad check, so let the tester judge. If the assembly must be replaced or moved, that becomes plumbing work with its own permit questions. Never remove or bypass a backflow device to make a nuisance go away. It protects the neighbors' drinking water as well as yours.

For multi-unit and business properties, rules and test frequency can be stricter, see commercial backflow testing.

How is a permit application completed, and are plans needed?

Start with the office's counter staff or online instructions, because requirements depend on the job. Simple like-for-like repairs may need only a short application, while new lines, gas work, or a moved fixture may need a sketch showing pipe sizes and routes. Whoever does the work normally prepares it, and a tidy hand sketch is often all a small job needs.

Have these ready: the property address and parcel number, the contractor's name and license number, the estimated value of the work, a summary of what will be done, plus a drawing whenever the office requests one. An owner can ask the office to explain what owner-builder rules allow, and gas and water heater work still carry safety stakes you should not guess at.

Permits end with an inspection. Do not cover pipe until the inspector has seen it, and keep the signed card. It matters if you sell. When you are weighing a job that needs one, request a written quote and have the plumber confirm who handles the permit.

Which water district is asking for my test?

Your water bill answers it. In and around Murrieta the supplier is often Eastern Municipal Water District, while parts of the city fall under Rancho California Water District or Western Municipal Water District's Murrieta Division, so do not assume. Wildomar is generally Elsinore Valley Municipal Water District. In San Diego County, Fallbrook and De Luz are mostly Fallbrook Public Utility District, and Rainbow has its own district.

Parts of Canyon Lake sit in two districts. The city advises calling to verify which district serves your street. Then ask the district two things: do you need a test on this property, and when is the report due. Rules differ, and a notice may arrive in the mail. If a notice came, keep it, since the plumber needs the assembly's location and any serial number.

Never ignore the notice. A district can ask for proof of testing, and a missing report can lead to follow-up from the supplier. Check the notice for the deadline, and arrange the test before the date.

Common questions

What is the duration of a backflow test?

One assembly usually takes under an hour, and a failed one needs repair time and a retest. Water to that line is off for a short while. The tester's report still has to reach the district, so ask who files it and keep your own copy.

Which questions go to a backflow tester before hiring?

Find out whether the district accepts their credential, who files the report, whether the test and any repair are priced together, how a failed assembly is handled, and if they service your device type. Write down the assembly's location and any notice number before they arrive.

Do I need to be at home for a test or inspection?

A person has to provide access to the assembly, the water shutoff and, for an inspection, the work area. If the device sits outside by a meter, you may not need to be present, but confirm with the tester. For permit inspections the office sets windows, so plan around them.